Key Largo by Dave Vangsness, Riverside, California
               
               4 April 2011 (Cont'd) 
                 
                
               
                    
                
               
                    
                  The jig I made to drill the shaft hole.  It consists of
                  a hole saw mounted in the end of a dowel that was turned on
                  the lathe to fit into the strut exactly.  The strut was
                  located and temporarily secured and dowel passed
                  through.  I epoxied a steel bolt in the end of the dowel
                  and chucked into the drill.  A block of wood was placed
                  on the hull to give the bit a square surface to bite
                  into.  I sat on the block while my son ran
                  the drill!
                
               
                    
                
               
                    
                  Masking and painting of waterline and bottom.
                
               
                    
                  Family Bassett Hound is Layla!
                
               
                    
                
               
                    
                
               
                    
                  "Righting Day"  I used the "Beer and
                  Buddies" method. 
                
               
                    
                
               
                    
                  Although it was a bit rainy, all went well.
                
               
                    
                
                
                 
                
               
                  Continue
                
             |