Subject: Union Jack / Scott A. Ochocki / blackout_again@hotmail.com / 2-10-01: All stations tacked in place. Over-sized chine bar (3/4") and added shear bar tacked in place, but will need a little fine-tuning. Began adding longitudinal stiffners on port side, but like an idiot forgot to notch the stations when I drafted and nested them for the CNC cutter, so I have had to cut the notches with a heavy-duty nibbler. The nibbler really growls cutting 3/16"! Mistakes have been made, nothing a little time and the right tools can't fix.

Continue