Klondike by
Dan Cowles
Costa Mesa, CA

In the beginning...

Frames on the building form.

Longitudinals

Longitudinals at the bow.

Keel

Bottom framing.

Multi-layer sheer.

Side batten.

Starting bottom planking.

First side planking layer. This planking method is called
either cold-molded or multi-diagonal.

Second side planking layer.

Third planking layer.

Dan wanted his boat to be noticed from a long way off, it
worked. Several visitors to our office immediately knew the boat when we
said... yellow.

Project finished 1981. Cost: $42,000 with deluxe
equipment.