22 September 2004

Skulling Skiff / Luis Reis / S. J. Campos, São Paulo, Brazil / I've finished in 2002 my Skulling Skiff which took me around 7 months to finish it. It was built in Plywood (Pinewood) fully covered with Fiberglass (Epoxi). It was painted with PU varnish. All skulling gear was acquired locally.

Continue